Power supply unit
110
Service Manual TruSystem 7000 Operating Table – 1 764 986 – 10/2016
Restore the original cable routing.
Insert all the plugs into the sockets on the power board (PB1).
6. Set the cable deflector onto the two screws on the column
base and slide it flush against the power supply unit. Mount the
cable deflector to the power supply unit (2 screws on the top)
and tighten the two screws on the column base.
7. Establish the internal power supply, close the column cover
and turn on the operating table (see chapter 10 on page 33).
8. Put on the pad.
9. Update the software (see the software description from the
CAN test center).
5.
CAUTION
Risk of material damage due to incorrect connector
pin assignment!
Do not interchange the battery connections! Maintain the
plug and socket assignments (see circuit diagram on
page 295).
TEST
Perform recheck according to IEC 60601-1; perform function test
and final check.
Summary of Contents for TruSystem 7000
Page 1: ...TruSystem 7000 Operating Table Service Manual...
Page 4: ...Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Page 10: ...Contents 10 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Page 297: ...Circuit Diagram Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016 297...
Page 298: ...Circuit Diagram 298 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Page 300: ...Hydraulics Diagram 300 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Page 302: ...Hydraulic Jack Unit 302 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Page 304: ...Service Information 304 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Page 305: ......