March 2000 © TOSHIBA TEC
3-33
DP120F/DP125F Installation
5.2.5 MEMORY PBA (DP120F Only)
The optional memory PBA provide of 4MB of image (PIX) memory. The memory PBA is con-
nected directly to the Main PBA connector.
Composing Parts:
• MEMORY PBA
:
1
• Bind screw M-3X8 B-tight-zc :
2
• Locking support
:
1
Installing Procedure:
Before beginning, power the unit off and read through “5.1 Remarks Before Starting Works.”
(Page 3-19)
(1)
Remove the two screws holding the PCB assembly.
(2)
Move the knob in the direction shown by the arrow and pull out the PCB assembly.
(See Fig. 3-5-15)
(3)
Attach the Locking support.
(4)
Directly connect the Memory PBA connector with the MAIN PBA connector (CN7).
US/CA/TW model
EU/AU/ASIA/HK model
Fig. 3-5-18
3-5-18US
3-5-18EU
(5)
Reinstall the remaining components in the reverse order.
(6)
After assembling, turn the Power switch ON, and check the following:
•
Perform “MEMORY CLEAR” of “01. MEMORY CLEAR” in “5. MAINTENANCE” of test
mode. (Refer to page 11-27.)
MAIN PBA (CN7)
Memory PBA
MAIN PBA (CN7)
Memory PBA
Summary of Contents for DP120F
Page 1: ...PLAINPAPERFACSIMILE File No 31200001 R0112216901 TTEC ...
Page 401: ...DP120F DP125F Circuit Description 7 92 March 2000 TOSHIBA TEC 07 05 00 Fig 7 5 1 ...
Page 656: ...DP120F DP125F Troubleshooting 11 44 March 2000 TOSHIBA TEC ...
Page 700: ...DP120F DP125F Appendix 12 2 March 2000 TOSHIBA TEC 1 2 Error Count List ...
Page 701: ...March 2000 TOSHIBA TEC 12 3 DP120F DP125F Appendix 1 3 Function List for Maintenance ...
Page 702: ...DP120F DP125F Appendix 12 4 March 2000 TOSHIBA TEC 1 4 Drum Unit ...
Page 703: ...March 2000 TOSHIBA TEC 12 5 DP120F DP125F Appendix 1 5 Memory Dump List ...
Page 706: ...SHUWA SHIBA PARK BLDG A 2 4 1 SHIBA KOEN MINATO KU TOKYO 105 8524 JAPAN ...