DP120F/DP125F Troubleshooting
11-26
March 2000 © TOSHIBA TEC
1.5.11 PCL BOARD TEST
[MENU], [9], [4], [11]
This test checks if the unit communicates normally with the optionally installed GA-1020 (Op-
tional PCL board.) The test can be conducted only when the GA-1020 is installed.
(1)
Use the [
↑
] or [
↓
] key to select “11. PCL BOARD TEST”, and then press the [ENTER]
key.
(2)
When you complete the test, press the [STOP] key to return to the standby mode screen.
(3)
Depending on the result of the test, replace the Main PBA by referring to “Chapter 8
Removal/Replacement/Adjustment” on page 8-46, or the GA-1020 by referring to its manual.
→
PCL BOARD TEST
PCL BOARD TEST
OK
When the test has been
completed normally
Summary of Contents for DP120F
Page 1: ...PLAINPAPERFACSIMILE File No 31200001 R0112216901 TTEC ...
Page 401: ...DP120F DP125F Circuit Description 7 92 March 2000 TOSHIBA TEC 07 05 00 Fig 7 5 1 ...
Page 656: ...DP120F DP125F Troubleshooting 11 44 March 2000 TOSHIBA TEC ...
Page 700: ...DP120F DP125F Appendix 12 2 March 2000 TOSHIBA TEC 1 2 Error Count List ...
Page 701: ...March 2000 TOSHIBA TEC 12 3 DP120F DP125F Appendix 1 3 Function List for Maintenance ...
Page 702: ...DP120F DP125F Appendix 12 4 March 2000 TOSHIBA TEC 1 4 Drum Unit ...
Page 703: ...March 2000 TOSHIBA TEC 12 5 DP120F DP125F Appendix 1 5 Memory Dump List ...
Page 706: ...SHUWA SHIBA PARK BLDG A 2 4 1 SHIBA KOEN MINATO KU TOKYO 105 8524 JAPAN ...