March 2000 © TOSHIBA TEC
11-7
DP120F/DP125F Troubleshooting
1.2.3 LED TEST
[MENU], [9], [2], [03]
The test checks the LED operation by lighting all the LED's on the Operation panel.
(1)
Use the [
↑
] or [
↓
] key to select “03. LED TEST”, and then press the [ENTER] key.
(2)
Visually check that all the LED's are on. After checking, press the [STOP] key.
LED TEST
CHECK IF ALL LEDS
ARE TURNED ON
STOP TO COMPLETE
(3)
Use the [
↑
] or [
↓
] key to select “1.OK” or “2.NG”, and then press the [ENTER] key.
If all the LED's are turn on, select “1.OK.” If even one of them is not lit, select “2.NG.”
(4)
The "OPERATION COMPLETED" message is displayed and the unit returns to the test
item select screen of the INDIVIDUAL TEST.
<Remarks>
The result of the LED TEST can be checked with the self test report. For
printing the self test report, refer to “1.3 TEST RESULT LIST” on page 11-
14.
If the result of the LED TEST is judged to be NG, solve the problem by
referring to “1.5.1 OPE. PANEL TEST” on page 11-16.
LED TEST
ENTER TEST RESULT
1.OK
2.NG
Summary of Contents for DP120F
Page 1: ...PLAINPAPERFACSIMILE File No 31200001 R0112216901 TTEC ...
Page 401: ...DP120F DP125F Circuit Description 7 92 March 2000 TOSHIBA TEC 07 05 00 Fig 7 5 1 ...
Page 656: ...DP120F DP125F Troubleshooting 11 44 March 2000 TOSHIBA TEC ...
Page 700: ...DP120F DP125F Appendix 12 2 March 2000 TOSHIBA TEC 1 2 Error Count List ...
Page 701: ...March 2000 TOSHIBA TEC 12 3 DP120F DP125F Appendix 1 3 Function List for Maintenance ...
Page 702: ...DP120F DP125F Appendix 12 4 March 2000 TOSHIBA TEC 1 4 Drum Unit ...
Page 703: ...March 2000 TOSHIBA TEC 12 5 DP120F DP125F Appendix 1 5 Memory Dump List ...
Page 706: ...SHUWA SHIBA PARK BLDG A 2 4 1 SHIBA KOEN MINATO KU TOKYO 105 8524 JAPAN ...