March 2000 © TOSHIBA TEC
8-3
DP120F/DP125F Removal/Replacement
2.1.2 Operation Panel Assembly
Before disassembling or reassembling, be sure to refer to “1. Before Disassembling or Reas-
sembling.”
(1)
Open the top cover.
(2)
Remove the three screws from the operation panel assembly, and remove the operation
panel assembly.
Fig. 8-2-2
(3)
Disconnect the connector from CN1 on the operation panel PBA.
Fig. 8-2-3
(4)
Reassemble the components in the reverse order of disassembly.
NOTE:
After reassembling, perform the operation panel test referring to the "Chap-
ter 11:1.5.1 OPE. PANEL TEST" on page 11-16.
08-02-02
08-02-03
Operation panel assembly
Operation
panel PBA
Connector
CN1
Summary of Contents for DP120F
Page 1: ...PLAINPAPERFACSIMILE File No 31200001 R0112216901 TTEC ...
Page 401: ...DP120F DP125F Circuit Description 7 92 March 2000 TOSHIBA TEC 07 05 00 Fig 7 5 1 ...
Page 656: ...DP120F DP125F Troubleshooting 11 44 March 2000 TOSHIBA TEC ...
Page 700: ...DP120F DP125F Appendix 12 2 March 2000 TOSHIBA TEC 1 2 Error Count List ...
Page 701: ...March 2000 TOSHIBA TEC 12 3 DP120F DP125F Appendix 1 3 Function List for Maintenance ...
Page 702: ...DP120F DP125F Appendix 12 4 March 2000 TOSHIBA TEC 1 4 Drum Unit ...
Page 703: ...March 2000 TOSHIBA TEC 12 5 DP120F DP125F Appendix 1 5 Memory Dump List ...
Page 706: ...SHUWA SHIBA PARK BLDG A 2 4 1 SHIBA KOEN MINATO KU TOKYO 105 8524 JAPAN ...