DP120F/DP125F Troubleshooting
11-6
March 2000 © TOSHIBA TEC
1.2.2 KEY TEST
[MENU], [9], [2], [02]
The test checks the key switch operation on the Operation panel.
(1)
Use the [
↑
] or [
↓
] key to select “02. KEY TEST”, and then press the [ENTER] key.
KEY TEST
PRESS ALL KEYS
EXCEPT STOP KEY
(2)
Press all the key switches except the [STOP] key. If all the keys except the [STOP] key
have been detected, the screen below is displayed.
KEY TEST
PRESS STOP KEY
<Remarks>
If you fail to press all of the keys on the operation panel including
before pressing [STOP] key, the result will be NG.
(3)
Press the [STOP] key. The result of the key test (“OK” or “NG”) is displayed on the screen,
and the unit returns to the test item select screen of the INDIVIDUAL TEST.
KEY TEST
OK
<Remarks>
Unless the [STOP] key is pressed within 10 seconds after the screen in
step (2) is displayed, the test result is judged to be NG.
<Remarks>
The result of the KEY TEST can be checked with the self test report. For
printing the self test report, refer to “1.3 TEST RESULT LIST” on page 11-
14.
If the result of the KEY TEST is judged to be NG, solve the problem by
referring to “1.5.1 OPE. PANEL TEST” on page 11-16.
Summary of Contents for DP120F
Page 1: ...PLAINPAPERFACSIMILE File No 31200001 R0112216901 TTEC ...
Page 401: ...DP120F DP125F Circuit Description 7 92 March 2000 TOSHIBA TEC 07 05 00 Fig 7 5 1 ...
Page 656: ...DP120F DP125F Troubleshooting 11 44 March 2000 TOSHIBA TEC ...
Page 700: ...DP120F DP125F Appendix 12 2 March 2000 TOSHIBA TEC 1 2 Error Count List ...
Page 701: ...March 2000 TOSHIBA TEC 12 3 DP120F DP125F Appendix 1 3 Function List for Maintenance ...
Page 702: ...DP120F DP125F Appendix 12 4 March 2000 TOSHIBA TEC 1 4 Drum Unit ...
Page 703: ...March 2000 TOSHIBA TEC 12 5 DP120F DP125F Appendix 1 5 Memory Dump List ...
Page 706: ...SHUWA SHIBA PARK BLDG A 2 4 1 SHIBA KOEN MINATO KU TOKYO 105 8524 JAPAN ...