ICS-2000 Ion Chromatography System
B-52
Doc. 031857-03 4/06
B.14.2 Eluent Generator Setup for Carbonate/Bicarbonate
Eluent
Follow the instructions in this section if you are installing a K
2
CO
3
cartridge, an EPM, and an EGC CO
3
Mixer (for generating
carbonate/bicarbonate eluent).
•
If you are installing a K
2
CO
3
cartridge and an EGC CO
3
Mixer (for
generating carbonate eluent), go to
•
If you are installing a KOH, LiOH, MSA, or NaOH EluGen cartridge
and a CR-TC, go to
.
Overview
The eluent generator setup procedure for carbonate/bicarbonate eluent
consists of the following main steps:
•
Installing the EluGen cartridge.
•
Connecting the EluGen cartridge vent line.
•
Installing the EPM.
•
Plumbing the EPM for conditioning.
•
Recording the EluGen cartridge and the EPM serial numbers in
Chromeleon.
•
Conditioning the EluGen cartridge and the EPM.
•
Installing the EGC CO
3
Mixer.
•
Temporarily filling the EGC CO
3
Mixer with deionized water.
•
Filling the EGC CO
3
Mixer with eluent of the required concentration.
•
Completing the eluent generator setup.
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...