Setting Up the Eluent Generator
Doc. 031857-03 4/06
B-85
10. Disconnect the
TO INJ VALVE IN - P/ELUENT OUT
line from port
P
(
2
)
on the injection valve.
11. Use a 10-32 to 10-32 coupler (P/N 042627) to connect the
TO INJ
VALVE IN - P/ELUENT OUT
line to one end of the yellow 0.5 mL/min,
7 MPa (1000 psi) backpressure coil (P/N 053765) (see
12. Direct the free end of the backpressure coil to a temporary waste
container.
Figure B-83. Plumbing Connections for Conditioning the
EluGen Cartridge with Carbonate Eluent
EGC Cable
Temporary
Waste
Container
Back-
pressure
Coil
TO INJ VALVE
IN - P/
ELUENT OUT
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...