Installing and Plumbing the Columns and Suppressor
Doc. 031857-03 4/06
B-25
B.9.3
Installing the Suppressor
1. Locate the suppressor
mounting tabs on the
component panel (see
into the opening
between the tabs and
pull the yellow
connector and attached
cable slightly out of the
opening.
2. Connect this cable to the
cable from the
suppressor (align the
pins on the two
connectors and push
them together).
Figure B-22. Suppressor Mounting Tabs
and Guidelines
3. Orient the suppressor with the
REGEN OUT
fitting on top and the
cable to the right.
4. Feed the cable into the opening in the component panel.
5. Align the top of the suppressor with the guideline printed on the
) and align the slots on the rear of
the suppressor with the tabs on the panel.
1
1
2
3
4
1
Suppressor
Mounting Tabs
Suppressor
Cable Connector
Guideline for
AES
Guideline for
SRS
1
2
3
4
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...