Setting Up the Eluent Generator
Doc. 031857-03 4/06
B-49
15. Disconnect the
backpressure coil
from the EluGen
cartridge
OUTLET
port
.
16. Connect the
EGC
OUT
line to the
OUTLET
Figure B-46. EGC Inlet and Outlet Connections
17. Turn over the EluGen cartridge. Check for bubbles; if necessary,
shake and tap the EluGen cartridge to remove bubbles.
18. Reinstall the EluGen cartridge in the holder.
19. Do not reconnect the EluGen cartridge cable until after hydrating the
CR-TC.
Hydrating the CR-TC
Always hydrate the CR-TC before initial operation. This requires running
ASTM filtered, Type 1 (18 megohm-cm) deionized water through the CR-
TC for 10 minutes, while bypassing the columns and suppressor.
illustrates the liquid flow path through the CR-TC during the
hydration procedure.
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...