ICS-2000 Ion Chromatography System
B-66
Doc. 031857-03 4/06
Plumbing the EluGen Cartridge and EPM for Conditioning
illustrates the liquid flow path through the EluGen cartridge
and EPM during the conditioning procedure.
Figure B-65. EluGen Cartridge and EPM Plumbing for Conditioning with
Carbonate/Bicarbonate Eluent
EGC
IN
TO DEGAS
ELUENT OUT
WASTE,
GAS
SEPARATOR
TO INJ
VALVE IN - P/
ELUENT OUT
EGC VENT
TO DEGAS
ELUENT IN
EGC
DEGAS
Connect to
Gas Separator
Assembly
Pre-plumbed
Pump Pulse
Damper
to
Inlet
Outlet
Send to waste
EGC II
K CO
2
3
TO CR-TC/EPM
REGEN IN
(orange)
TO PUMP/
DAMPER
TO CR-TC/EPM
ELUENT OUT
(yellow label)
TO
C
R-
TC
/E
PM
RE
GE
N
OU
T
(b
lue
la
be
l)
EPM
EL
UE
NT
I
N
TO
C
R
-TC
/E
P
M
E
L
U
E
N
T
IN
(r
ed
la
b
el
)
EGC
OUT
Back-
pressure
Coil
10-32 to
1/4-28 Coupler
TO SRS/AES
REGEN OUT
14 MPa (2000 psi)
at 1.0 mL/min
(yellow
label)
(blue
label)
(red
label)
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...