3 • Operation and Maintenance
Doc. 031857-03 4/06
3-21
4. Click the
Add
button on the
Batch List
tab and add the sequence you
created in
for an example.
Figure 3-14. Batch Dialog Box with an Example Sequence Added to the Batch List
5. To start the batch, click
Start
.
3.12 Maintenance
This section describes routine maintenance procedures that users may perform.
All other maintenance procedures must be performed by Dionex personnel.
As Needed
•
Regularly check the eluent reservoir and refill when needed.
Daily
•
Check the ICS-2000 component mounting panel (see
) for leaks or
spills. Wipe up spills. Isolate and repair leaks (see
). Rinse off any
dried eluent with deionized water.
•
Check the waste container daily and empty when needed.
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...