
5 • Service
Doc. 031857-03 4/06
5-67
1. Disconnect the
TO INJ VALVE IN - P/ELUENT OUT
line from the EGC
CO
3
Mixer inlet.
2. Use a 10-32 to 10-32 coupler (P/N 042627) to connect the yellow
0.5 mL/min, 7 MPa (1000 psi) backpressure coil (P/N 053765) to the
TO INJ VALVE IN - P/ELUENT OUT
line.
3. Connect a 10-32 to 1/4-28 coupler (P/N 042806) to the free end of the
backpressure coil.
4. Disconnect the
TO SRS/AES REGEN OUT
line from the suppressor
REGEN OUT
port.
5. Connect the
TO SRS/AES REGEN OUT
line to the 10-32 to 1/4-28
NOTE The backpressure coil connection in
temporary; it is used only during the hydration and
conditioning procedure described in the next
section.
Figure 5-61. Backpressure Coil Connections for Hydrating and
Conditioning the EPM with Carbonate Eluent
10-32 to
1/4-28
coupler
TO INJ
VALVE
IN - P/
ELUENT OUT
Backpressure
Coil
TO SRS/AES
REGEN OUT
10-32 to
10-32 coupler
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...