
Teledyne ML
- T100 UV Fluorescence SO2 Analyzer
EPA Protocol Calibration
201
Analyzer operational
settings
TEST measurements at
nominal values
2. T100 in SAMPLE mode
Weekly visual inspection
Adjust or repair as needed
Analyzer operational
check
Zero and span within
tolerance limits as described
in Subsec. 9.1.3 of Sec.
2.0.9 (Q.A. Handbook)
Level 1 zero/span every 2
weeks; Level 2 between Level
1 checks at frequency desired
analyzer by user
Find source of error and repair
After corrective action, re-
calibrate analyzer
Precision check
Assess precision as
described in Sec. 2.0.8 and
Subsec. 3.4.3 (Ibid.)
Every 2 weeks, Subsec. 3.4.3
(Ibid.)
Calc, report precision, Sec. 2.0.8
(Ibid.)
7.2. LEVEL 1 CALIBRATIONS VERSUS LEVEL 2 CHECKS
Essential to quality assurance are scheduled checks for verifying the operational status
of the monitoring system. The operator should visit the site at least once each week. It is
recommended Level 1 zero and span check conducted on the analyzer every two weeks.
Level 2 zero and span checks should be conducted at a frequency desired by the user.
Definitions of these terms are given in Table 7-4.
In addition, an independent precision check between 0.08 and 0.10 ppm must be carried
out at least once every two weeks. Table 7-3 summarizes the quality assurance activities
for routine operations. A discussion of each activity appears in the following sections.
To provide for documentation and accountability of activities, a checklist should be
compiled and then filled out by the field operator as each activity is completed.
Summary of Contents for T100
Page 2: ......
Page 4: ...Teledyne ML T100 UV Fluorescence SO2 Analyzer iv This page intentionally left blank ...
Page 6: ...Teledyne ML T100 UV Fluorescence SO2 Analyzer vi This page intentionally left blank ...
Page 10: ...Teledyne ML T100 UV Fluorescence SO2 Analyzer x This page intentionally left blank ...
Page 20: ...Teledyne ML T100 UV Fluorescence SO2 Analyzer xx ...
Page 21: ...21 PART I GENERAL INFORMATION ...
Page 77: ...77 PART II OPERATING INSTRUCTIONS ...
Page 78: ...Getting Started Teledyne ML T100 UV Fluorescence SO2 Analyzer 78 ...
Page 207: ...207 PART III TECHNICAL INFORMATION ...
Page 208: ...208 06807A DCNxxxx ...
Page 210: ...210 06807A DCNxxxx This page intentinally left blank ...
Page 362: ...APPENDIX B T100 Spare Parts List T100 Instruction Manual B 2 068070000 Rev A ...
Page 370: ...APPENDIX D ELECTRONIC SCHEMATICS T100 Instruction Manual D 2 068070000 Rev A ...