
Calibration Procedures
Teledyne ML - T100 UV Fluorescence SO2 Analyzer
182
To perform a manual calibration check of an analyzer with a zero/span valve or IZS
Option installed, use the following method:
STEP ONE
: Connect the sources of Zero Air and Span Gas as shown below.
SAMPLE
ZERO AIR
EXHAUST
Source of
SAMPLE Gas
VENT if input is pressurized
Internal Zero/Span Option (IZS) – Option 51A
Ambient
Air
External Zero
Air Scrubber
Filter
MODEL 701
Zero Air
Generator
Source of
SAMPLE Gas
VENT if input is pressurized
MODEL 700
Gas Dilution Calibrator
(with O
3
generator option)
V
E
N
T
SAMPLE
ZERO AIR
EXHAUST
SPAN 1
Calibrated
SO
2
gas
(At high
concentration)
VENT
Needle valve
to control flow
Chassis
Chassis
Figure 6-9: Setup for Manual Calibration Check with Z/S Valve or IZS Option (Step 1)
Summary of Contents for T100
Page 2: ......
Page 4: ...Teledyne ML T100 UV Fluorescence SO2 Analyzer iv This page intentionally left blank ...
Page 6: ...Teledyne ML T100 UV Fluorescence SO2 Analyzer vi This page intentionally left blank ...
Page 10: ...Teledyne ML T100 UV Fluorescence SO2 Analyzer x This page intentionally left blank ...
Page 20: ...Teledyne ML T100 UV Fluorescence SO2 Analyzer xx ...
Page 21: ...21 PART I GENERAL INFORMATION ...
Page 77: ...77 PART II OPERATING INSTRUCTIONS ...
Page 78: ...Getting Started Teledyne ML T100 UV Fluorescence SO2 Analyzer 78 ...
Page 207: ...207 PART III TECHNICAL INFORMATION ...
Page 208: ...208 06807A DCNxxxx ...
Page 210: ...210 06807A DCNxxxx This page intentinally left blank ...
Page 362: ...APPENDIX B T100 Spare Parts List T100 Instruction Manual B 2 068070000 Rev A ...
Page 370: ...APPENDIX D ELECTRONIC SCHEMATICS T100 Instruction Manual D 2 068070000 Rev A ...