6-3
6-2 Preparing for Operation
6
Opera
tion
Turning ON Power
• First carry out the preliminary checks, and then turn ON the control-circuit power supply.
It makes no difference whether or not the main-circuit power supply is turned ON.
• The alarm (/ALM) output will take approximately 2 seconds to turn ON after the power has been
turned ON. Do not attempt to detect an alarm using the Host Controller during this time (if power
is turned ON while the Host Controller is connected).
Checking Displays
Displays on the Servo Drive
• The following will appear on the display on the Servo Drive when the power supply is turned ON.
Approx. 2 s
Approx. 0.6 s
Approx. 0.6 s
…Default display (Determined
by the setting of parameter Pn01.)
8.8.8.8.8.8.
8k8k8k8k8k8k
rk k k k k0k
. . . . . .
Summary of Contents for R88D-GT series
Page 20: ...18 Table of Contents ...
Page 234: ...3 133 3 8 Reactor Specifications 3 Specifications ...
Page 448: ...7 37 7 5 Manual Tuning 7 Adjustment Functions ...
Page 474: ...8 25 8 5 Periodic Maintenance 8 Troubleshooting ...
Page 475: ...Chapter 9 Appendix 9 1 Connection Examples 9 1 9 2 Parameter Tables 9 11 ...
Page 509: ......