7A1-30
MANUAL TRANSMISSION
A: Machined boss (Inside)
B: No machining (Outside)
5) Assemble 5th speed synchronizer sleeve (1) and hub (2) with
keys (3) and springs (4).
NOTE:
Short side C in keys, long boss D in hub and chamfered
spline F in sleeve should face inward (5th gear side).
A = B
C: Short side (Inward)
D: Long boss (Inward)
E: Key way
F: Chamfered spline (Inward)
6) Install countershaft 5th gear (1) to counter shaft facing ma-
chined boss A inward.
7) Apply oil to needle bearing and install it to input shaft.
8) Install input shaft 5th gear to input shaft.
9) Install new counter shaft nut (1) as follows:
a. Shift low speed gear shift shaft (2) to 1st gear position and
high speed gear shift shaft (3) to 3rd gear position.
b. Tighten nut with above double engagement and return shift
shafts to natural position.
Tightening Torque
(a): 70 N
.
m (7.0 kg-m, 51.0 lb-ft)