5) Check to ensure that valve clearance is adjusted correctly.
6) Remove spark plugs.
7) Install timing belt.
With two sets of marks (1), (2) and (3), (4) aligned, install timing
belt on two pulleys in such a way that drive side (5) of belt is free
from any slack.
NOTE:
When installing timing belt, match arrow mark (
) on
timing belt with rotating direction (6) of crankshaft.
8) Attach hexagon wrench (1) to belt tensioner hole and adjust belt
tension to specified.
(a) Move tensioner till timing belt tension is specification by
turning hexagon wrench clockwise as shown in figure and
measure timing belt tension by using special tool.
Special Tool
(A): 09919-56010
Belt tension under pressure 7 kg or 15.5 Ib
“a”: 10.5 mm (0.413 in.)
New belt
. . .
12.0 mm (0.472 in.)
Reuse belt
. . .
(b) Tighten tensioner bolt.
Tightening Torque
(a): 19 N
.
m (1.9 kg-m, 14.0 lb-ft)
(c) To take up slack of timing belt, turn crankshaft two rotations
clockwise.
Then confirm again that two sets of marks are aligned re-
spectively. And confirm belt tension again as previously
outlined.
NOTE:
Perform step 8) repeatedly, after loosen tensioner bolt,
if belt tension is out of standards.
6A1-18
ENGINE MECHANICAL (F8D ENGINE)