
215184
432
Revision A
1.
Position the header 150 mm (6 in.) above the ground, and
unlock the float.
1013274
A
Figure 9.275: Float Lock
2.
Check that float lock linkage is on down stops (washer [A]
cannot be moved) at both locations.
NOTE:
If the header is not on down stops during the next two
steps, the voltage may go out of range during operation
causing a malfunction of the AHHC system.
1015833
A
B
Figure 9.276: Float Indicator Box
3.
Adjust cable take-up bracket (B) (if necessary) until
pointer (A) on the float indicator is on 0.