215184
313
Revision A
1016095
A
B
Figure 9.13: Float Indicator Box
6.
Adjust cable take-up bracket (B) (if necessary) until
pointer (A) on the float indicator is on
0
.
1017836
A
Figure 9.14: Optional Two-Sensor Kit
–
Right Sensor
7.
Use a voltmeter to measure the voltage between the
ground (Pin 2) and signal (Pin 3) wires of AHHC sensor (A)
at the back of the float module side frame. Ensure it is at
the high voltage limit for the combine. For voltage limit
chart, refer to Table
.
NOTE:
The wiring harness connector must be attached to the
sensor. Do
NOT
disconnect it.
8.
Repeat at the opposite side.
1016102
A
Figure 9.15: Float Indicator Box
9.
Fully lower the combine feeder house, and float the header
up off the down stops (float indicator [A] should be at
4
,
and the float module should be fully separated from the
header).
NOTE:
You may need to hold the HEADER DOWN switch for a few
seconds to ensure the feeder house is fully lowered.