
215184
234
Revision A
1027109
A
B
C
Figure 7.68: Harness Connections
9.
Pull the ends of cab draper extension harness (A) up into
the cab through hole (B).
NOTE:
The illustration shows an S6, S7, T6, or T7 Series combine.
Earlier models may look different.
10. Connect cab draper extension harness (A) to cab draper
control harness (C) (MD #304210) as follows:
•
Plug C4B into C4A.
•
Plug C6B into C6A.
11. Reinstall floor mat.
NOTE:
Any extra wire can be placed between the floor mat and
the right console at the cup holder.
1008177
A
B
Figure 7.69: Storage Compartment and Cover
12.
For S6 Series, T6 Series, and earlier combines:
In the
combine cab, open the storage compartment on the
console.
13.
For S6 Series, T6 Series, and earlier combines:
Remove two
screws (A) attaching compartment cover (B) to the console
and then remove the cover.
1027110
A
B
Figure 7.70: Rocker Switch Supports
14.
For S6 Series, T6 Series, and earlier combines:
Two rocker
switch supports are provided: MD #158377 (A) and
MD #220734 (B). Select the one you need to use:
•
MD #158377
–
Used on John Deere 60 and 70 Series
combines
•
MD #220734
–
Used on John Deere S and T Series
combines