Perform Basic Operations
60
Parameter Setting Mode
The following table lists the functions groups under Parameter mode.
Function Group Name Keypad Display Description
Drive
DRV
Configures basic operation parameters. These
include jog operation, motor capacity evaluation, and
torque boost.
Basic
BAS
Configures basic operation parameters. These
parameters include motor parameters and multi-step
frequency parameters.
Advanced
ADV
Configures acceleration or deceleration patterns,
frequency limits, energy saving features, and,
regeneration prevention features.
Control
CON
Configures the features related to speed search and
KEB (kinetic energy buffering).
Input Terminal
IN
Configures input terminal
–related features, including
digital multi
–functional inputs and analog inputs.
Output Terminal
OUT
Configures output terminal
–related features,
including digital multi
–functional outputs and analog
outputs.
Communication
COM
Configures the USB-related features and
communication features for the RS-485, Modbus-
RTU, LS Bus, Metasys N2, and BACnet. Optional
communication module related features may be
configured as well, if one is installed.
PID process
PID
Configures the PID control-related features.
EPID process
EPI
Configures the external PID control-related features.
Application 1
AP1
Configures the Sleep Boost, SoftFill, and Multiple
motor control (MMC) features related to the PID
control.
Application 2
AP2
Configures the HVAC features by setting the features
such as load tuning, pump cleaning, and pay back
counter.
Application 3
AP3
Configures the time event-related features.
Protection
PRT
Configures motor and inverter protection features.
Motor 2 (Secondary
motor)
M2
Configures the secondary motor-related features.
Summary of Contents for LSLV-H100 Series
Page 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 35: ...Installing the Inverter 22 ...
Page 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Page 181: ...168 Learning Advanced Features PID Command Block ...
Page 182: ...169 Learning Advanced Features ...
Page 183: ...170 Learning Advanced Features PID Feedback Block ...
Page 184: ...171 Learning Advanced Features PID Output Block ...
Page 185: ...172 Learning Advanced Features PID Output Mode Block ...
Page 198: ...185 Learning Advanced Features EPID1 Control block ...
Page 199: ...186 Learning Advanced Features EPID2 Control block ...
Page 220: ...207 Learning Advanced Features ...
Page 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Page 506: ...Table of Functions 493 ...
Page 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Page 549: ...Troubleshooting 536 ...
Page 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 570: ...Technical Specification 557 110 185 kW 3 phase ...
Page 601: ...588 ...
Page 602: ...589 ...
Page 603: ...590 ...