286
Learning Advanced Features
The priority of each Motor is arranged automatically based on operating time.
Among operating Motors, Motor with the longest operating time is placed at the last.
The moment for the priority arrangement is the time when the number of motor is changed
.
St art Freq 1
St art Freq 3
Out Freq
Run Cmd
Follower Freq
M1 OutFreq
M2 OutFreq
FeedBack
PI D Reference
St art Freq 2
M3 OutFreq
M2, M3, M1
M1 Cmd Freq
PID Ctrl
M2 Cmd Freq
M3 Cmd Freq
Main Motor
Aux Motor
PI D Output
PI D Limit High
Pr iority at the moment
M2
M1
M3
Init ial Priority
M1
M2
M3
Pr iority at the moment
M2
M3
M1
More t han 1min
Less than 1min
t
M3
M2
St op Freq 3
St op Freq 1
Follower Freq
Follower Freq
PID Ctrl
Main Motor
Aux Motor
Aux Motor
Aux Motor
PID Ctrl
Main Motor
M1
M2
M3
M2, M3
The picture below shows the operating time of M1 is the longest during Multi Follower
Mode.
St art Freq 1
St art Freq 3
Out Freq
High Freq
M1 OutFreq
M2 OutFreq
St art Freq 2
M3 OutFreq
M2, M3, M1
Run Cmd
FeedBack
PI D Reference
M1 Cmd Freq
PID Ctrl
M2 Cmd Freq
M3 Cmd Freq
Main Motor
PID Ctrl
PID Ctrl
Aux Motor
Aux Motor
PI D Output
PI D Limit High
More t han 1min
Less than 1min
M2, M1
Pr iority at the moment
M2
M1
M3
Init ial Priority
M1
M2
M3
Pr iority at the moment
M2
M3
M1
M1
St op Freq 1
St op Freq 3
M2, M3, M1
[Aux Stop DT]
M2, M3, M1
M3
M2
M2, M3
t
Main Motor
Aux Motor
Aux Motor
Main Motor
The conditions that Aux Motor is turned on and off are same as the description of Multi
Master Mode and Multi Follower Mode.
Summary of Contents for LSLV-H100 Series
Page 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 35: ...Installing the Inverter 22 ...
Page 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Page 181: ...168 Learning Advanced Features PID Command Block ...
Page 182: ...169 Learning Advanced Features ...
Page 183: ...170 Learning Advanced Features PID Feedback Block ...
Page 184: ...171 Learning Advanced Features PID Output Block ...
Page 185: ...172 Learning Advanced Features PID Output Mode Block ...
Page 198: ...185 Learning Advanced Features EPID1 Control block ...
Page 199: ...186 Learning Advanced Features EPID2 Control block ...
Page 220: ...207 Learning Advanced Features ...
Page 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Page 506: ...Table of Functions 493 ...
Page 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Page 549: ...Troubleshooting 536 ...
Page 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 570: ...Technical Specification 557 110 185 kW 3 phase ...
Page 601: ...588 ...
Page 602: ...589 ...
Page 603: ...590 ...