![LS ELECTRIC LSLV-H100 Series User Manual Download Page 390](http://html1.mh-extra.com/html/ls-electric/lslv-h100-series/lslv-h100-series_user-manual_1943798390.webp)
RS-485
Communication Features
377
7.4 BACnet Communication
7.4.1 What is BACnet Communication?
BACnet (Building Automation and Control network) is a communication network frequently
used in building automation. BACnet introduces the concept of object-oriented systems,
and defines standardized objects. By exchanging data, this function makes communication
possible between products from different companies. It also standardizes some of the
general services carried out by using these standard objects.
7.4.2 BACnet Communication Standards
Application
Items
Specification
Connection
Interface
5 Pin Pluggable connector
Data transmission
RS-485 MS/TP, Half-duplex
Cable
Twisted pair (1 pair and shield)
Communication
BACnet MS/TP
Stated in ANSI/ASHRAE Standards 135-2004
Baud Rate
Supports 9600, 19200, 38400, 76800 bps
MAC Address
1
–127
Start/Stop bit
Start 1 bit, Stop ½ bit
Parity check
None/Even/Odd
7.4.3 BACnet Quick Communication Start
Follow the instructions below to configure the BACnet network for a quick start.
1
Set five multi-function input terminals (IN-65
–71 PxDefine) to ‘Interlock 1’ – ‘Interlock 5’
respectively, in the correct motor order.
Note
•
When auto change mode selection (AP1
–55) is set to ‘0 (None)’ or ‘1 (Aux)’, and if 5
motors are operated, including the main motor, the interlock numbers 1,2,3,4,5 refer
to the monitors connected to Relay 1,2,3,4,5 (If interlock numbers 1,2,3,4,5 are
connected to Relay 1,2,3,4,5 at the inverter output terminal).
•
If auto change mode selection (AP1-
55) is set to ‘2 (Main)’, and the main and
Summary of Contents for LSLV-H100 Series
Page 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 35: ...Installing the Inverter 22 ...
Page 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Page 181: ...168 Learning Advanced Features PID Command Block ...
Page 182: ...169 Learning Advanced Features ...
Page 183: ...170 Learning Advanced Features PID Feedback Block ...
Page 184: ...171 Learning Advanced Features PID Output Block ...
Page 185: ...172 Learning Advanced Features PID Output Mode Block ...
Page 198: ...185 Learning Advanced Features EPID1 Control block ...
Page 199: ...186 Learning Advanced Features EPID2 Control block ...
Page 220: ...207 Learning Advanced Features ...
Page 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Page 506: ...Table of Functions 493 ...
Page 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Page 549: ...Troubleshooting 536 ...
Page 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 570: ...Technical Specification 557 110 185 kW 3 phase ...
Page 601: ...588 ...
Page 602: ...589 ...
Page 603: ...590 ...