![LS ELECTRIC LSLV-H100 Series User Manual Download Page 340](http://html1.mh-extra.com/html/ls-electric/lslv-h100-series/lslv-h100-series_user-manual_1943798340.webp)
Learning
Protection Features
327
To operate under load trip properly, a load tuning (AP2-01 Load Tune) must be performed in
advance. If you cannot perform a load tuning, manually set the load fit frequencies (AP2-02
Load Fit Lfreq
–AP2-10 Load Fit Hfreq). The Under Load protection does not operate while the
Energy Save function is in operation.
6.3.1 Fan Fault Detection
Group Code
Name
LCD Display
Parameter Setting Setting range
Unit
PRT
79
Cooling fan fault
selection
Fan Trip
Mode
Warning
0-1
OUT
31
–35
Multi-function
relay 1
–5
Relay 1
–5
8
Fan
Warning
-
OUT
36
Multi-function
output 1
Q1 Define
* With a capacity of 110 kW or more, failure mode of internal fan is selected by selection of PRT-79.
Fan Fault Detection Setting Details
Code
Description
PRT-79 Fan Trip
Mode
Set the cooling fan fault mode.
Setting
Function
0
Trip
The inverter output is blocked and the fan trip is
displayed when a cooling fan error is detected.
1
Warning
When OUT-36 (Q1 Define) and OUT-31
–35
(Relay1
–5) are set to ‘8 (FAN Warning)’, the fan
error signal is output and the operation continues.
OUT-36 Q1 Define,
OUT-31
–35
Relay1
–5
When the code value is
set to ‘8 (FAN Warning)’, the fan error signal is
output and operation continues. However, when the inverter’s inside
temperature rises above a certain level, output is blocked due to
activation of overheat protection.
6.3.2 Low Voltage Fault Trip
When inverter input power is lost and the internal DC link voltage drops below a certain
voltage level, the inverter stops output and a low voltage trip occurs.
Summary of Contents for LSLV-H100 Series
Page 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 35: ...Installing the Inverter 22 ...
Page 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Page 181: ...168 Learning Advanced Features PID Command Block ...
Page 182: ...169 Learning Advanced Features ...
Page 183: ...170 Learning Advanced Features PID Feedback Block ...
Page 184: ...171 Learning Advanced Features PID Output Block ...
Page 185: ...172 Learning Advanced Features PID Output Mode Block ...
Page 198: ...185 Learning Advanced Features EPID1 Control block ...
Page 199: ...186 Learning Advanced Features EPID2 Control block ...
Page 220: ...207 Learning Advanced Features ...
Page 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Page 506: ...Table of Functions 493 ...
Page 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Page 549: ...Troubleshooting 536 ...
Page 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 570: ...Technical Specification 557 110 185 kW 3 phase ...
Page 601: ...588 ...
Page 602: ...589 ...
Page 603: ...590 ...