237
Learning Advanced Features
Speed Search Operation Setting Details
Starting with power-on:
Set bit 4 to ‘1’ and ADV-10 (Power-on Run)
to ‘1 (Yes)’. If inverter input power is supplied while the inverter
operation command is on, the speed search operation will accelerate
the motor up to the frequency reference.
CON-72 SS Sup-
Current
The amount of current flow is controlled during speed search operation
based on the motor’s rated current. If CON-70 (SS mode) is set to ‘1
(Flying Start-
2)’, this code is not visible.
CON-73 SS P-
Gain,
CON-74 SS I-Gain
The P/I gain of the speed search controller can be adjusted. If CON-70
(SS Mode) is set to ‘1(Flying Start-2)’, different factory defaults, based
on motor capacity, are used and defined in DRV-14 (Motor Capacity).
CON-75 SS Block
Time
The block time parameter prevents overvoltage trips due to counter
electromotive force.
Note
If operated within the rated output, the H100 series inverter is designed to withstand
instantaneous power interruptions within 8 ms and maintain normal operation. The DC
voltage inside the inverter may vary depending on the output load. If the power interruption
time is longer than 8 ms, a low voltage trip may occur.
Select the Speed search function (normal acceleration) for a proper re-operation during a
free-run.
If the speed search function (normal acceleration) is not selected during the acceleration, an
over current trip or an overload trip may occur.
Summary of Contents for LSLV-H100 Series
Page 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 35: ...Installing the Inverter 22 ...
Page 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Page 181: ...168 Learning Advanced Features PID Command Block ...
Page 182: ...169 Learning Advanced Features ...
Page 183: ...170 Learning Advanced Features PID Feedback Block ...
Page 184: ...171 Learning Advanced Features PID Output Block ...
Page 185: ...172 Learning Advanced Features PID Output Mode Block ...
Page 198: ...185 Learning Advanced Features EPID1 Control block ...
Page 199: ...186 Learning Advanced Features EPID2 Control block ...
Page 220: ...207 Learning Advanced Features ...
Page 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Page 506: ...Table of Functions 493 ...
Page 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Page 549: ...Troubleshooting 536 ...
Page 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 570: ...Technical Specification 557 110 185 kW 3 phase ...
Page 601: ...588 ...
Page 602: ...589 ...