![LS ELECTRIC LSLV-H100 Series User Manual Download Page 6](http://html1.mh-extra.com/html/ls-electric/lslv-h100-series/lslv-h100-series_user-manual_1943798006.webp)
Table of Contents
v
Table of Contens
Selecting and Preparing a Site for Installation ...................................... 11
Enabling the RTC (Real-Time Clock) Battery ........................................ 23
Operation Keys ........................................................................... 52
About the Display ........................................................................ 54
Display Modes ............................................................................ 58
Learning to Use the Keypad ................................................................... 61
Display Mode Selection .............................................................. 61
Operation Modes ........................................................................ 62
Switching between Groups in Parameter Display Mode ......... 64
Switching between Groups in User & Macro Mode ................. 65
Navigating through the Codes (Functions) ............................... 66
Navigating Directly to Different Codes....................................... 68
Parameter Settings available in Monitor Mode ......................... 70
Setting the Monitor Display Items .............................................. 72
Selecting the Status Bar Display Items ..................................... 73
Monitoring Faults during Inverter Operation ............................. 75
Monitoring Multiple Fault Trips ................................................... 76
Switching between the Operation Modes (HAND / AUTO / OFF) ....... 81
Setting Frequency Reference ................................................................ 86
Keypad as the Source (KeyPad-1 setting) ................................ 87
Summary of Contents for LSLV-H100 Series
Page 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 35: ...Installing the Inverter 22 ...
Page 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Page 181: ...168 Learning Advanced Features PID Command Block ...
Page 182: ...169 Learning Advanced Features ...
Page 183: ...170 Learning Advanced Features PID Feedback Block ...
Page 184: ...171 Learning Advanced Features PID Output Block ...
Page 185: ...172 Learning Advanced Features PID Output Mode Block ...
Page 198: ...185 Learning Advanced Features EPID1 Control block ...
Page 199: ...186 Learning Advanced Features EPID2 Control block ...
Page 220: ...207 Learning Advanced Features ...
Page 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Page 506: ...Table of Functions 493 ...
Page 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Page 549: ...Troubleshooting 536 ...
Page 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 570: ...Technical Specification 557 110 185 kW 3 phase ...
Page 601: ...588 ...
Page 602: ...589 ...
Page 603: ...590 ...