NOTE:
The SRX5800 Services Gateway supports a redundant SCB, provided the SCB is a
SRX5K-SCBE (SCB2) running Junos OS Release 12.1X47-D15 and later, or a SRX5K-SCB3
(SCB3) running Junos OS Release 15.1X49-D10 and later.
The SRX5800 Services Gateway does not support a redundant SCB (third SCB) card if
SRX5K-SPC-4-15-320 (SPC2) is installed with SCB1 (SRX5K-SCB). If you have installed a
SPC2 on a SRX5800 Services Gateway with a redundant SCB1 card, make sure to remove
the redundant SCB1 card.
•
Power supplies—When powered by standard-capacity AC power supplies, a minimum of three power
supplies are required to supply power to a fully configured services gateway. All AC power supplies
share the load evenly. The addition of a fourth power supply provides full power redundancy. If one
power supply fails in a redundant configuration, the three remaining power supplies provide full power.
When powered by DC power supplies or high-capacity AC power supplies, two power supplies are
required to supply power to a fully configured services gateway. One power supply supports approximately
half of the components in the services gateway, and the other power supply supports the remaining
components. The installation of two additional power supplies provides full power redundancy. If one
or two power supplies fail, the remaining power supplies can provide full power to the services gateway.
•
Cooling system—The cooling system has redundant components, which are controlled by the host
subsystem. If one of the fans fails, the host subsystem increases the speed of the remaining fans to
provide sufficient cooling for the services gateway indefinitely.
SRX5800 Chassis
IN THIS SECTION
SRX5800 Services Gateway Chassis | 29
SRX5800 Services Gateway Physical Specifications | 32
SRX5800 Services Gateway Midplane Description | 34
SRX5800 Services Gateway Cable Manager Description | 35
SRX5800 Services Gateway Craft Interface Overview | 36
SRX5800 Services Gateway Craft Interface Alarm LEDs and Alarm Cutoff/Lamp Test Button | 37
SRX5800 Services Gateway Craft Interface Host Subsystem LEDs | 37
SRX5800 Services Gateway Craft Interface Power Supply LEDs | 38
SRX5800 Services Gateway Craft Interface Card OK/Fail LEDs | 38
28
Summary of Contents for SRX 5800
Page 1: ...SRX5800 Services Gateway Hardware Guide Published 2020 02 10 ...
Page 23: ......
Page 30: ...Figure 2 Rear View of a Fully Configured AC Powered Services Gateway Chassis 31 ...
Page 111: ...LEDs 112 ...
Page 121: ...Port and Interface Numbering 122 ...
Page 127: ...Port and Interface Numbering 128 ...
Page 161: ......
Page 179: ... One SRX5K MPC IOC2 Modular Port Concentrator with two Modular Interface Cards MICs 180 ...
Page 180: ... One SRX5K 40GE SFP I O card IOC 181 ...
Page 205: ......
Page 261: ......
Page 324: ...c Upload the configuration to RE2 from the USB device 325 ...
Page 365: ...Figure 143 Installing an SPC 366 ...
Page 367: ...368 ...
Page 422: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the SRX5800 425 ...
Page 423: ......
Page 457: ......
Page 473: ...475 ...
Page 476: ...Restricted Access Area Warning 478 ...
Page 483: ...485 ...
Page 496: ...Jewelry Removal Warning 498 ...
Page 499: ...Operating Temperature Warning 501 ...
Page 509: ...DC Power Disconnection Warning 511 ...
Page 513: ...DC Power Wiring Sequence Warning 515 ...
Page 516: ...DC Power Wiring Terminations Warning 518 ...
Page 519: ...DC Power Disconnection Warning 521 ...
Page 523: ...DC Power Wiring Sequence Warning 525 ...