
4. If a card uses fiber-optic cable, immediately cover each transceiver and the end of each cable with a
rubber safety cap. Arrange the disconnected cables in the cable management system, to prevent the
cables from developing stress points.
WARNING:
Do not look directly into a fiber-optic transceiver or into the ends
of fiber-optic cables. Fiber-optic transceivers and fiber-optic cables connected
to a transceiver emit laser light that can damage your eyes.
CAUTION:
Do not leave a fiber-optic transceiver uncovered except when you
are inserting or removing cable. The safety cap keeps the port clean and prevents
accidental exposure to laser light.
CAUTION:
Avoid bending a fiber-optic cable beyond its minimum bend radius.
An arc smaller than a few inches in diameter can damage the cable and cause
problems that are difficult to diagnose.
5. For SCBs, observe these points regarding the ejector handles:
•
When removing or inserting an SCB, ensure that the SCBs or blank panels in adjacent slots are fully
inserted to avoid hitting them with the ejector handles. The ejector handles require that all adjacent
components be completely inserted so the ejector handles do not hit them, which could result in
damage.
•
The ejector handles have a center of rotation and need to be stored toward the center of the board.
Ensure the long ends of the ejectors located at both the top and the bottom of the board are vertical
and pressed as far as possible toward the center of the board. Once you have installed an SCB, place
the ejector handles in their proper position, vertically and toward the center of the board. To avoid
blocking the visibility of the LEDs, position the ejectors over the PARK icon.
•
To insert or remove the SCB card, slide the ejector across the SCB horizontally, rotate it, and slide it
again another quarter of a turn. Turn the ejector again and repeat as necessary. Use the indexing
feature to maximize leverage and to avoid hitting any adjacent components.
6. Simultaneously turn both the ejector handles counterclockwise to unseat the card.
7. Grasp the handles and slide the card straight out of the card cage halfway.
8. Place one hand around the front of the card and the other hand under it to support it. Slide the IOC
completely out of the chassis, and place it on the antistatic mat or in the electrostatic bag.
222
Summary of Contents for SRX 5800
Page 1: ...SRX5800 Services Gateway Hardware Guide Published 2020 02 10 ...
Page 23: ......
Page 30: ...Figure 2 Rear View of a Fully Configured AC Powered Services Gateway Chassis 31 ...
Page 111: ...LEDs 112 ...
Page 121: ...Port and Interface Numbering 122 ...
Page 127: ...Port and Interface Numbering 128 ...
Page 161: ......
Page 179: ... One SRX5K MPC IOC2 Modular Port Concentrator with two Modular Interface Cards MICs 180 ...
Page 180: ... One SRX5K 40GE SFP I O card IOC 181 ...
Page 205: ......
Page 261: ......
Page 324: ...c Upload the configuration to RE2 from the USB device 325 ...
Page 365: ...Figure 143 Installing an SPC 366 ...
Page 367: ...368 ...
Page 422: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the SRX5800 425 ...
Page 423: ......
Page 457: ......
Page 473: ...475 ...
Page 476: ...Restricted Access Area Warning 478 ...
Page 483: ...485 ...
Page 496: ...Jewelry Removal Warning 498 ...
Page 499: ...Operating Temperature Warning 501 ...
Page 509: ...DC Power Disconnection Warning 511 ...
Page 513: ...DC Power Wiring Sequence Warning 515 ...
Page 516: ...DC Power Wiring Terminations Warning 518 ...
Page 519: ...DC Power Disconnection Warning 521 ...
Page 523: ...DC Power Wiring Sequence Warning 525 ...