Maintenance 6. Joint #2
222
C8 Rev.13
Installation: Joint #2 Motor
1.
Install the motor plate to the Joint #2 motor.
Hexagon socket head cap bolts: 4-M6×20
Tightening torque: 13.0
±
0.6 N
·
m
Be careful of the assembly direction of the motor plate.
(See the photo.)
2.
Mount the Joint #2 electromagnetic brake to the Joint #2 motor
unit.
Hexagon socket set screws: 2-M6×6 (with a brass bushing)
Tightening torque: 8.0
±
0.4 N·m
Be careful of the assembly direction of the Joint #2
electromagnetic brake. (See the photo.)
Fix the set screws while pressing the electromagnetic brake to
the motor plate.
The brass bushing is not necessary for the screw for the flat
surface (D-cut). Set the bushing to the other screw and then
fix the screw.
If the screw positions are incorrect or the bushing is not set, it
may cause damage on the side of the brake and may result in
the part being unable to be removed.
NOTE
NOTE
Summary of Contents for C8 Series
Page 1: ...Rev 13 EM208R4413F 6 Axis Robots C8 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual C8 series Rev 13 ...
Page 8: ...vi C8 Rev 13 ...
Page 14: ...Table of Contents xii C8 Rev 13 ...
Page 16: ......
Page 31: ...Setup Operation 2 Specifications C8 Rev 13 17 2 4 Outer Dimensions Unit mm 2 4 1 C8 A701 C8 ...
Page 32: ...Setup Operation 2 Specifications 18 C8 Rev 13 2 4 2 C8 A901 C8L ...
Page 33: ...Setup Operation 2 Specifications C8 Rev 13 19 2 4 3 C8 A1401 C8XL ...
Page 49: ...Setup Operation 3 Environment and Installation C8 Rev 13 35 C8 A901 C8L ...
Page 98: ......
Page 183: ...Maintenance 4 Cable Unit C8 Rev 13 169 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Page 184: ...Maintenance 4 Cable Unit 170 C8 Rev 13 ...
Page 185: ...Maintenance 4 Cable Unit C8 Rev 13 171 ...
Page 186: ...Maintenance 4 Cable Unit 172 C8 Rev 13 4 2 2 Power Cable C8 A701 C8 C8 A901 C8L ...
Page 187: ...Maintenance 4 Cable Unit C8 Rev 13 173 C8 A1401 C8XL ...
Page 188: ...Maintenance 4 Cable Unit 174 C8 Rev 13 C8 A701 C8 C8 A901 C8L C8 A1401 C8XL ...