Proline Prowirl F 200 PROFIBUS PA
Installation
Hauser
25
Q
TT
1
2
3
A0019209
7
Layout for delta heat measurement of saturated steam and water
1
Measuring device
2
Temperature sensor
3
Heat exchanger
Q
Heat flow
Protective cover
Observe the following minimum head clearance: 222 mm (8.74 in)
For information on the weather protection cover, see → 185
6.2
Mounting the measuring device
6.2.1
Required tools
For transmitter
• For turning the transmitter housing: Open-ended wrench8 mm
• For opening the securing clamps: Allen key3 mm
• For turning the transmitter housing: Open-ended wrench8 mm
• For opening the securing clamps: Allen key3 mm
For sensor
For flanges and other process connections: Corresponding mounting tools
6.2.2
Preparing the measuring device
1. Remove all remaining transport packaging.
2. Remove any protective covers or protective caps present from the sensor.
3. Remove stick-on label on the electronics compartment cover.
6.2.3
Mounting the sensor
L
WARNING
Danger due to improper process sealing!
‣
Ensure that the inside diameters of the gaskets are greater than or equal to that of the
process connections and piping.
‣
Ensure that the gaskets are clean and undamaged.
‣
Install the gaskets correctly.
Summary of Contents for Proline Prowirl F 200
Page 224: ...www addresses endress com...