3
PL1000
RS_G
BI
VZ.
fm
3-
6
- 04.
07
7
Operation ................................................................................................. 72
7.1
Preparing for operation ............................................................................ 72
Devices and aids ................................................................................. 72
Before starting work ............................................................................. 72
Checklist for machine operator ............................................................ 73
7.2
Starting the machine ................................................................................ 74
Auxiliary starting (electrical starting aid) .............................................. 76
............................................................................................................. 76
Allowing engine to „warm up“ .............................................................. 77
Driving the machine ............................................................................. 78
8
Milling instructions .................................................................................... 79
„Driving“ position .................................................................................. 79
„Milling“ position ................................................................................... 79
Zero setting .......................................................................................... 80
Surface milling ..................................................................................... 80
Milling at the edge of the lane or at steps ............................................ 81
Milling at the curb (with deployed chassis leg) .................................... 81
Milling at the curb (with chassis leg swivelled in) ................................. 82
Planing without automatic levelling device .......................................... 84
8.1
Operating the Moba-matic during milling ................................................. 86
Initial situation for operation ................................................................. 86
8.2
Other tasks for adopting the initial position for milling: ............................. 87
Milling with height sensors ................................................................... 87
Milling with height sensors together with the transverse slope sensor 91
Ending the milling procedure ............................................................... 93
Parking the machine ............................................................................ 94
Parking the machine for long periods of time ...................................... 95
9
Scope for using the small planers ............................................................ 96
Remedying longitudinal and transverse bumps in the road surface .... 96
Remedying cracks ............................................................................... 96
Remedying potholes, frost damage ..................................................... 96
Remedying damage to edges and bumps ........................................... 97
Producing adjoining edges .................................................................. 97
Producing slots, joints and cable trenches .......................................... 97
Removing embedded markings ........................................................... 98
Removing road markings ..................................................................... 98
Re-establishing surface grip ................................................................ 98
10
Malfunctions ............................................................................................. 99
10.1
Error code query for engine ..................................................................... 99
Output of the numerical code ............................................................... 99
Error codes ........................................................................................ 101
10.2
Error messages for anti-slip control ....................................................... 109
10.3
Error message from travel drive ............................................................. 110
10.4
MOBA-Matic error messages ................................................................. 111
E
Set-up and modification ......................................................... 1
1
Special safety instructions ......................................................................... 1
2
Planing without upper conveyor / Preparation for transport ....................... 2
2.1
Dismantling the upper conveyor ................................................................ 2
Summary of Contents for PL 1000 RS
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorizied Dynapac Dealer SPARE PARTS...
Page 10: ......
Page 27: ...B 15 B_PL1000RS_GB fm 15 18 04 07 14 14 13 16 16 3 17 20 19 2 2 18 13 21 22 23 24...
Page 38: ......
Page 42: ...D 4 D_PL1000RS_GB fm 4 112 04 07 P 0 I I I 8 Panel3_600 cdr A 7 5 3 4 6...
Page 64: ...D 26 D_PL1000RS_GB fm 26 112 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Page 66: ...D 28 D_PL1000RS_GB fm 28 112 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Page 86: ...D 48 D_PL1000RS_GB fm 48 112 04 07 5 Operating the MOBA matic Nivellcompl cdr A C B...
Page 90: ...D 52 D_PL1000RS_GB fm 52 112 04 07 Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Page 149: ...D 111 D_PL1000RS_GB fm 111 112 04 07 10 4 MOBA Matic error messages...
Page 150: ......
Page 228: ......