Setting Up the Eluent Generator
Doc. 065294-01 3/09
83
Installing the EluGen Cartridge and Preparing for Conditioning
Follow the steps in this section to install the EluGen cartridge and prepare
it for conditioning before initial use.
illustrates the liquid flow path during the conditioning
procedure.
Figure 83. EluGen Cartridge Plumbing for Conditioning with Carbonate Eluent
EGC
DEGAS
EGC
IN
Connect to
Gas Separator
Assembly
TO DEGAS
ELUENT OUT
TO SRS/AES
REGEN OUT
WASTE,
GAS
SEPARATOR
Connect to
Suppressor
Regen Out
Pre-plumbed
Pump Pulse
Damper
to
Inlet
Outlet
EGC VENT
Send to waste
EGC
OUT
EGC II
K CO
2
3
TO DEGAS
ELUENT IN
Back-
pressure
Coil
TO INJ
VALVE IN - P/
ELUENT OUT
To waste
14 MPa (2000 psi)
at 1.0 mL/min
TO PUMP/
DAMPER