Setting Up the Eluent Generator
Doc. 065294-01 3/09
39
Overview
The eluent generator setup procedure for KOH, LiOH, MSA, or NaOH
eluents consists of the following main steps:
•
Installing the CR-TC.
•
Installing the EluGen cartridge.
•
Connecting the EluGen cartridge vent line.
•
Recording the EluGen cartridge serial number in Chromeleon.
•
Conditioning the EluGen cartridge.
•
Hydrating the CR-TC.
•
Completing the eluent generator setup.
Items Required to Complete the Setup Procedure
In addition to the EluGen cartridge and the CR-TC, you will need the
following items to complete the eluent generator setup.
Item
P/N
Use To
Yellow 0.5 mL/min, 7 MPa
(1000 psi) backpressure coil
(supplied in the ICS-2100
Ship Kit (P/N 064375))
053765
Provide backpressure during
setup procedures.
EluGen Cartridge Vent Line
Tubing Kit
(supplied with the cartridge)
063092
Vent the cartridge during
operation.
10-32 to 1/4-28 coupler
(supplied in the ICS-2100
Ship Kit)
042806
Provide a temporary connection
during setup procedures.
Temporary waste container
(beaker, bottle, etc.)
(not supplied)
n/a
Collect waste during setup
procedures.
10-32 fittings
10-32 ferrules
043275
043276
Complete the connections.
1/8-in fittings
1/8-in ferrules
052267
048949
Complete the connections.