Doc. 065294-01 3/09
1
Installation
This document provides instructions for the initial installation of the ICS-2100 Ion
Chromatography System
NOTE The order of the steps is important. It is especially
important to install the Chromeleon
®
Chromatography
Management System before connecting the USB cable
and turning on the system power.
1.
Facility Requirements
•
Make sure the installation site meets the following environmental
specifications:
Main Power
: 100 to 240 Vac, 50 to 60 Hz (Auto-sensing power supply; no
manual voltage or frequency adjustment required)
Operating Temperature
: 4 to 40 °C (40 to 104 °F
)
Humidity
: 5% to 95% relative humidity, noncondensing
•
Provide a sturdy workbench for the system of a height that ensures convenient
access to the interior of the ICS-2100.
•
Allow at least 15 cm (6 in) behind the system for power connections and
ventilation. For optimal performance, install the system in a draft-free
location, out of the path of air conditioning and heating vents.
•
(Optional) For pressurization of the eluent reservoir, provide a clean gas
source regulated to between 0.55 and 0.83 MPa (80 and 120 psi). An air
regulator accessory (P/N 060054) is required to regulate the pressure to
between 0.03 and 0.04 MPa (5 and 6 psi).
Do not pressurize the eluent reservoir above 0.07 MPa (10 psi).
Ne mettez jamais les réservoirs d'éluants sous une pression
supérieure à 0,07 MPa (10 lb/po²).