ICS-2100 Installation Instructions
80
Doc. 065294-01 3/09
18.3
Eluent Generator Setup for Carbonate Eluent
Follow the instructions in this section if you are installing a K
2
CO
3
cartridge and an EGC CO
3
Mixer (for generating carbonate eluent).
•
If you are installing a KOH, LiOH, MSA, or NaOH EluGen cartridge
and a CR-TC, go to
.
•
If you are installing a K
2
CO
3
cartridge, an EPM, and an EGC CO
3
Mixer (for generating carbonate/bicarbonate eluent), go to
.
Overview
The eluent generator setup procedure for carbonate eluent consists of the
following main steps:
•
Installing the EluGen cartridge and preparing for conditioning.
•
Conditioning the EluGen cartridge.
•
Installing the EGC CO
3
Mixer.
•
Filling the EGC CO
3
Mixer with the eluent concentration required for
the application.
•
Completing the eluent generator setup.