ICS-2100 Installation Instructions
66
Doc. 065294-01 3/09
5. Remove the plug from the
EGC-2
connector on top of the ICS-2100.
6. Connect the EPM electrical cable to the
EGC-2
connector.
Figure 69. EluGen Cartridge and EPM Plumbing with Tubing Extensions
EGC
IN
TO DEGAS
ELUENT OUT
WASTE,
GAS
SEPARATOR
TO INJ
VALVE IN - P/
ELUENT OUT
EGC VENT
TO DEGAS
ELUENT IN
EGC
DEGAS
Connect to
Gas Separator
Assembly
Pre-plumbed
Pump Pulse
Damper
to
Inlet
Outlet
Send to waste
EGC II
K CO
2
3
TO CR-TC/EPM
REGEN IN
(orange label)
TO PUMP/
DAMPER
TO CR-TC/EPM
ELUENT OUT
(yellow label)
TO
C
R-
TC
/E
PM
RE
GE
N
OU
T
(b
lue
la
be
l)
EPM
E
L
U
E
N
T
IN
TO
C
R
-T
C
/E
P
M
E
L
U
E
N
T
IN
(r
ed
la
b
el
)
EGC
OUT
TO SRS/AES
REGEN OUT
Pre-plumbed
Inject Valve
Port P
to
28 cm (11 in) of clear
1.58-mm (0.062-in) ID
Teflon tubing (P/N 064337)
35 cm (14 in) of black
0.25-mm (0.010-in) ID
PEEK tubing (P/N 064340)
30 cm (12 in) of black
0.25-mm (0.010-in) ID
PEEK tubing (P/N 064334)
(yellow
label)
(blue
label)
(red
label)