Daily
Guide
Running the ABX Quality Control
Pentra
80 - User Manual - RAB108EA
2–7
2.2. Open tube
If any parameter results and/or any statistical
Data are displayed in “RED”, perform the following
steps:
1- Verify that the analyzed QC results correlates
with control lot, (scrolling list). If they do not
match, perform a control identification procedure
(See Section 3,
2- Rerun the control material.
3- Perform a concentrated cleaning on the system
(See Section 7,
then rerun the control material again.
Exit the «Quality Assurance» screen
Select the «
Quality Assurance/Quality Control/QC
grid
»
Select the control lot number and verify its iden-
tification (scrolling list).
When a control name or lot number does not exist,
perform a control identification procedure
Press the «STAT MODE» key
Summary of Contents for Pentra 80 RAB108EA
Page 1: ...User Manual P n RAB108EA ABX Diagnostics B P 7290 34184 MONTPELLIER Cedex 4 FRANCE...
Page 12: ...10 Section9 Glossary 1 Glossary 9 2 2 Index 9 4 3 9 11...
Page 87: ...Quality Assurance Calibration Pentra 80 User Manual RAB108EA 3 31 Fig 3 29 Delete options...
Page 162: ...Pentra 80 5 10 Pentra 80 User Manual RAB108EA Fig 5 6 Units tab...
Page 194: ...Pentra 80 5 42 Pentra 80 User Manual RAB108EA...
Page 214: ...Pentra 80 6 20 Pentra 80 User Manual RAB108EA...
Page 264: ...Pentra 80 7 50 Pentra 80 User Manual RAB108EA...
Page 284: ......
Page 286: ......
Page 288: ......
Page 290: ......
Page 292: ......
Page 294: ......
Page 296: ......
Page 306: ...Pentra 80 9 10 Pentra 80 User Manual RAB108EA Z Zoom Chap 4 28...