Connecting the tilt cabling
Note
Action
Valid for CRB 15000-5/0.95
Insert the cabling into the tubular.
1
xx2000002148
Valid for CRB 15000-10/1.52
and
CRB 15000-12/1.27
xx2300000845
xx2000002125
Reconnect the connectors to the drive board.
•
D3/4.X2 to X2
•
D3/4.DC- to Ground
•
D3/4.DC+ to +DC
2
xx2000002089
Connect the connectors to each other and snap
them to the cable holders.
•
J4/5.DC+ to J5/6.DC+
•
J4/5.DC- to J5/6.DC-
•
J4/5.CS to J5/6.CS
•
J4/5.CP to J5/6.CP
3
Continues on next page
966
Product manual - CRB 15000
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.6.6 Replacing the axis-4 joint unit
Continued
Summary of Contents for CRB 15000
Page 1: ...ROBOTICS Product manual CRB 15000 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 54: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 200: ...This page is intentionally left blank ...
Page 1058: ...This page is intentionally left blank ...
Page 1076: ...This page is intentionally left blank ...
Page 1095: ......