
Disconnecting the tool flange functional earth cable
Note
Action
xx2000002159
Remove the functional earth cable by removing
the screw.
1
Removing the tool flange adapter
Note
Action
xx2000002165
Remove the tool flange adapter screws.
1
xx2000002166
Press the adapter out of position by using two of
the attachment screws as removal tools.
2
xx2000002167
Remove the tool flange adapter.
3
Continues on next page
466
Product manual - CRB 15000
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.3.7 Replacing the axis-6 cabling
Continued
Summary of Contents for CRB 15000
Page 1: ...ROBOTICS Product manual CRB 15000 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 54: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 200: ...This page is intentionally left blank ...
Page 1058: ...This page is intentionally left blank ...
Page 1076: ...This page is intentionally left blank ...
Page 1095: ......