
Note
Action
xx2000002168
Remove the lifting aid by removing the screws.
10
Clean pushed-out flange sealant, if any.
11
Connecting the axis-6 joint unit cabling
Note
Action
xx2000002164
Reconnect the connectors to the drive board.
•
D6.X1 to X1
•
D6.DC+ to +DC
•
D6.DC- to Ground
•
D6.X4 to X4
•
D6.X2 to X2
•
D6.X5 to X5
1
xx2000002163
Connect the connectors to each other and snap
them to the cable holders.
•
J7.CS to J7.CS
•
J7.CP to J7.CP
2
Continues on next page
1014
Product manual - CRB 15000
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.6.7 Replacing the axis-5 joint unit and the axis-5 to axis-6 transition cabling
Continued
Summary of Contents for CRB 15000
Page 1: ...ROBOTICS Product manual CRB 15000 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 54: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 200: ...This page is intentionally left blank ...
Page 1058: ...This page is intentionally left blank ...
Page 1076: ...This page is intentionally left blank ...
Page 1095: ......