
Note
Action
xx2300000792
Fit the joint unit to the swing, aligning the pin with
the pin hole.
CAUTION
The connectors and the joint unit cables are
sensitive to mechanical damage. Handle the as-
sembly with care.
xx2300000780
6
xx2300000794
Check the joint unit position by placing the higher
boss of one semicircular block between the lifting
aid and swing.
The joint unit is properly placed when no gaps
between the block and both lifting aid and swing.
7
xx2300000795
Remove the guide pins.
8
Continues on next page
Product manual - CRB 15000
283
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.3.2 Replacing the axis-1 cabling
Continued
Summary of Contents for CRB 15000
Page 1: ...ROBOTICS Product manual CRB 15000 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 54: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 200: ...This page is intentionally left blank ...
Page 1058: ...This page is intentionally left blank ...
Page 1076: ...This page is intentionally left blank ...
Page 1095: ......