
Note
Action
xx2000002067
Connect the connectors to each other and snap
them to the cable holders.
•
J4.DC+ to J4/5.DC+
•
J4.DC- to J4/5.DC-
•
J4.CS to J4/5.CS
•
J4.CP to J4/5.CP
2
Hex socket head cap screw: M3x6 (1
pcs).
Secure the cables for functional earth and
protective earth with a screw.
3
Tightening torque: 0.8 Nm.
xx2000001945
Cable ties (3 pcs)
Secure the cabling with cable ties.
4
xx2000002066
Continues on next page
368
Product manual - CRB 15000
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.3.4 Replacing the axis-3 cabling
Continued
Summary of Contents for CRB 15000
Page 1: ...ROBOTICS Product manual CRB 15000 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 54: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 200: ...This page is intentionally left blank ...
Page 1058: ...This page is intentionally left blank ...
Page 1076: ...This page is intentionally left blank ...
Page 1095: ......