
Note
Action
xx2100000329
Remove the remaining attachment screws.
Use two screws as press out screws in the upcom-
ing step, then dispose all screws.
New screws are included in the spare part delivery
of the joint unit.
4
xx2100000330
Press the joint unit out of position using two of
the previous attachment screws as removal tools.
5
xx2000002169
Remove the joint unit from the tubular.
CAUTION
The connectors and the joint unit cables are
sensitive to mechanical damage. Handle the as-
sembly with care.
6
Position shown in the figure shows
axis 5 jogged to +20°, which is a
more convenient position when re-
placing only the axis-6 joint unit.
xx2000001957
Remove the lifting aid and guide pins.
7
Continues on next page
430
Product manual - CRB 15000
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.3.6 Replacing the axis-5 cabling
Continued
Summary of Contents for CRB 15000
Page 1: ...ROBOTICS Product manual CRB 15000 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 54: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 200: ...This page is intentionally left blank ...
Page 1058: ...This page is intentionally left blank ...
Page 1076: ...This page is intentionally left blank ...
Page 1095: ......