
Connecting the axis-5 joint unit cabling
Note
Action
xx2000002138
Reconnect the connectors to the drive board.
•
D4/5.X1 to X1
•
D5.DC+ to +DC
•
D5.DC- to Ground
•
D4/5.X4 to X4
•
D5/4.X2 to X2
•
D4/5.X5 to X5
1
xx2000002137
Connect the connectors to each other and snap
them to the cable holders.
•
J5/6.DC+ to J6.DC+
•
J5/6.DC- to J6.DC-
•
J5/6.CS to J6.CS
•
J5/6.CP to J6.CP
2
Hex socket head cap screw: M3x6 (1
pcs).
Secure the cables for functional earth and
protective earth with a screw.
3
Tightening torque: 0.8 Nm.
xx2000002136
Continues on next page
444
Product manual - CRB 15000
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.3.6 Replacing the axis-5 cabling
Continued
Summary of Contents for CRB 15000
Page 1: ...ROBOTICS Product manual CRB 15000 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 54: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 200: ...This page is intentionally left blank ...
Page 1058: ...This page is intentionally left blank ...
Page 1076: ...This page is intentionally left blank ...
Page 1095: ......