
SV63136 Rev. A
5-7
Troubleshooting • 5
Resuming the
Job
To resume running your job after a stoppage is cleared:
1. Make sure that there are no error messages on the screen and that all
system covers are closed.
2. Press START.
• If the error message on the screen instructed you to remove mate-
rial in trays to start a new collation, pressing START will begin a new
collation,
otherwise
• The job will resume counting from the last complete mail piece that it
produced.
During the recovery from jams and other machine stoppages, the system
will automatically clear material from the transport deck that cannot be
completed by the inserter.
The system counts all mail pieces that it has successfully completed (trial
pieces included), but partially assembled pieces are not counted and are
transported to the upper divert area. The user has two options The system
handles outsorts in these ways:
• Discard the items.
• Manually assemble the piece.
Handling
Outsorted
Material
Содержание Relay 5000
Страница 8: ...This page is intentionally blank ...
Страница 10: ...This page is intentionally blank ...
Страница 12: ...SV63136 Rev A This page is intentionally blank ...
Страница 18: ...This page is intentionally blank ...
Страница 20: ...This page is intentionally blank ...
Страница 44: ...This page is intentionally blank ...
Страница 46: ...This page is intentionally blank ...
Страница 92: ...This page is intentionally blank ...
Страница 98: ...This page is intentionally blank ...
Страница 118: ...SV63136 Rev A This page is intentionally blank ...
Страница 120: ...SV63136 Rev A This page is intentionally blank ...
Страница 132: ...This page is intentionally blank ...
Страница 134: ...This page is intensionally blank ...
Страница 148: ...This page is intentionally blank ...
Страница 194: ...This page is intentionally blank ...
Страница 201: ......
Страница 202: ...3001 Summer Street Stamford CT 06926 0700 www pitneybowes com SV63136 Rev A 2015 Pitney Bowes Inc All Rights Reserved ...