
C h a p t e r 4 P R O C E S S D E S C R I P T I O N
7/26/00
INTEGRA Operations Revision A
4-11
20-0200-231 (CR), 20-0200-232 (Std), 20-0200-251 (CD)
W
AFER
T
RANSFER
O
UT
(N
O
F
LAT
F
INDER
)
When the Spin Station is ready for a wafer, the top brush slows to
idle speed and lifts off of the wafer in Brush Station #2, the rollers
retract, and the conveyor activates to transport the wafer into the
Spin Station.
As the wafer transfers out of Brush Station #2, a manifold located at
the exit sprays DI water (top and bottom) to rinse the wafer.
Содержание Synergy Integra
Страница 8: ......
Страница 24: ...1 4 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Страница 38: ...2 14 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Страница 222: ...9 62 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Страница 314: ...10 76 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...