C h a p t e r 4 P R O C E S S D E S C R I P T I O N
7/26/00
INTEGRA Operations Revision A
4-23
20-0200-231 (CR), 20-0200-232 (Std), 20-0200-251 (CD)
Light Tower Option 12 (not used on Integra)
Notes
: 1) MOR has priority over MIR.
2) If Start Required enabled Processing starts when the operator or Gem acknowledges Start Required.
3) Processing is complete when the output cassette (or pod if Asyst SMIF) is ready to be removed.
COLOR
PURPOSE
STATUS
DESCRIPTION
Red
Alarm
Status
ON
Alarm present; Stop or Clearing.
OFF
Normal operation.
FLASH
Host issued request.
Yellow
Move-In
Request
or
Move-Out
Request
ON
MIR is present.
OFF
MIR or MOR is not present.
FLASH
MOR is present.
Green
Processing
ON
Lot is processing.
OFF
Processing is complete.
FLASH
N/A
Содержание Synergy Integra
Страница 8: ......
Страница 24: ...1 4 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Страница 38: ...2 14 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Страница 222: ...9 62 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Страница 314: ...10 76 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...