Point Substitution
SECTION 4 Objects
72
When performing alignment operations, the Master Object determines how the
other objects are aligned. The Master Object, i.e. the last object clicked on,
has green sizing handles.
1, 2, 3…
To align objects:
1. Select the objects to be aligned.
2. Ensure the correct master object is selected.
3. Choose the appropriate tool from the
Alignment
toolbar.
The alignment operations available at any one time vary according to the
number of objects selected.
4-5-14 Zoom
It is often useful to be able to view an object in more detail. The Zoom option
allows selected objects to be magnified up to four times their normal size.
To enlarge an area of the screen, choose the View menu and select Zoom.
Then select the required magnification factor: Off, 2 or 4.
A specific object can be zoomed in on by selecting that object and then
performing the procedures described above.
4-6
Point Substitution
This feature allows the points associated with one or more objects to be
changed 'en mass'. This can make reusing page objects, either by using copy
and paste or the Graphics Objects Library, simpler and quicker.
The
Point Substitution
dialog box is shown automatically after inserting a
library item, or on-demand by right clicking on an object or objects and
choosing 'Point Substitution', or from the
Edit
menu.
4-6-1
Example
In this example a button has been created which has a
Colour Change
animation and a script. Both are linked to 'PointA'. After performing a copy and
past on the item the Point Substitution dialog box can be used to choose the
points that should be re-linked. Clicking the
Browse
button will allow a new
point to be selected. Clicking
OK
will now replace all instances of 'PointA' with
'PointB' and then recompile the button animations and scripts.
Содержание CX-Supervisor
Страница 1: ...CX Supervisor Software Cat No W10E EN 01 User Manual Software Release 3 1...
Страница 3: ...Copyright Notice 2...
Страница 16: ...15...
Страница 17: ...16...
Страница 27: ...Tip of the Day SECTION 1 Graphics Editor 26...
Страница 35: ...CX Supervisor Preferences SECTION 2 Pages 34...
Страница 79: ...Responding to Events SECTION 5 ActiveX Objects 78...
Страница 115: ...Printing the Graphics Library SECTION 7 Graphics Library 114...
Страница 181: ...Data Logging SECTION 11 Data Logging 180...
Страница 201: ...Examples SECTION 12 Databases 200...
Страница 243: ...Performance Monitor SECTION 16 Application Analysis Performance Monitor 242...
Страница 253: ...Using with Omron s CX Server OPC SECTION 17 Using CX Supervisor as an OPC Cli 252...
Страница 259: ...Creating a CX Supervisor Client application SECTION 18 Connecting to a remote CX 258...
Страница 263: ...Adding a Point Linked to a Parameter SECTION 19 Connecting to Omron Industrial 262...
Страница 271: ...Data Logging SECTION 20 Best Practices 270...
Страница 275: ...Configuring a Server PC running Windows NT or 2000 Appendix A Configuring a PC 274...
Страница 277: ...Appendix B Frequently Asked Questions 276...
Страница 296: ...Appendix B Frequently Asked Questions 295...
Страница 297: ...Appendix B Frequently Asked Questions 296...
Страница 298: ...Appendix B Frequently Asked Questions 297...
Страница 299: ...Appendix B Frequently Asked Questions 298...
Страница 333: ...Revision history 332...