Application Analysis
SECTION 16 Application Analysis / Performance Monitor
238
Total ActiveX Objects
This is a count of the total number of ActiveX
objects used in the project, this includes objects
which are used more than once. Using ActiveX is
a great way of adding advanced functionality to
your application but it carries the risk that the
component used may not be as reliable as
required.
Total Alarms
A count of the total defined alarms on the system -
this is limited in ME so this gives an idea of if the
limit is being approached. Many alarms also make
an application harder to manage and maintain so
keep this number as low as possible and avoid
unnecessary alarms.
Total DDE Points
DDE is an antiquated technology and is prone to
problems especially when used with non English
characters. Any DDE points should be removed
and an alternative used instead.
Total Graphical Objects
The total number of objects used on all the pages
in the project. The more objects that are in the
project the slower larger it is on disk and the longer
it may take to re-draw a page. This is especially
key when using an IPC where space and power
are at a premium.
Total Memory Points
The total number of points that are not on an
external device. These are the most efficient
points as they don't consume network bandwidth,
Total OPC/Other Points
The total number of points that are external to CX-
Supervisor using a comms interface such as OPC
or on another CX-Supervisor runtime.
Total Pages
This is the total number of pages in your project
(including pop up pages). This is limited in ME so
this gives an idea of when you are approaching
this limit. Too many pages can make a project hard
to maintain so this should be kept to a minimum.
Total PLC Points
The total number of points in the application that
are on a device
Total PLCs
The total number of PLCs in this project - Any
PLCs used on the same network will obviously
share bandwidth. If there are more PLCs here than
you expect, check the PLC configuration and
make sure you've not defined a duplicate PLC.
Total Points
The total number of points in the project.
Obviously for simplicity and performance this
should be kept to the minimum you require.
Total Regular Interval
Scripts
Regular interval scripts indicate poor design
decisions. Running a script on a regular interval
can be inefficient and cause a significant increase
on local CPU usage. If regular interval scripts also
update points on devices this can lead to
increased bandwidth use. Consider using an 'on
condition' script instead.
Содержание CX-Supervisor
Страница 1: ...CX Supervisor Software Cat No W10E EN 01 User Manual Software Release 3 1...
Страница 3: ...Copyright Notice 2...
Страница 16: ...15...
Страница 17: ...16...
Страница 27: ...Tip of the Day SECTION 1 Graphics Editor 26...
Страница 35: ...CX Supervisor Preferences SECTION 2 Pages 34...
Страница 79: ...Responding to Events SECTION 5 ActiveX Objects 78...
Страница 115: ...Printing the Graphics Library SECTION 7 Graphics Library 114...
Страница 181: ...Data Logging SECTION 11 Data Logging 180...
Страница 201: ...Examples SECTION 12 Databases 200...
Страница 243: ...Performance Monitor SECTION 16 Application Analysis Performance Monitor 242...
Страница 253: ...Using with Omron s CX Server OPC SECTION 17 Using CX Supervisor as an OPC Cli 252...
Страница 259: ...Creating a CX Supervisor Client application SECTION 18 Connecting to a remote CX 258...
Страница 263: ...Adding a Point Linked to a Parameter SECTION 19 Connecting to Omron Industrial 262...
Страница 271: ...Data Logging SECTION 20 Best Practices 270...
Страница 275: ...Configuring a Server PC running Windows NT or 2000 Appendix A Configuring a PC 274...
Страница 277: ...Appendix B Frequently Asked Questions 276...
Страница 296: ...Appendix B Frequently Asked Questions 295...
Страница 297: ...Appendix B Frequently Asked Questions 296...
Страница 298: ...Appendix B Frequently Asked Questions 297...
Страница 299: ...Appendix B Frequently Asked Questions 298...
Страница 333: ...Revision history 332...